Industrial warehouse 450 m2

Modern high bay lighting. Industrial element is of steel portal frame construction.  The workshop has an eaves height of 8.5 metres. Industrial steel buildings covered with special insulated panels 120 mm with secret fix  form Austria. This sandwich panels finishes guarantee the highest possible level of heat and acoustic insulation from the outside, making the structure not only an ideal area for the storage of goods but also a useful work area.

  • Characteristics of a Project
     

    Wide:10 m

    Lenght: 45 m

    Height: 7.5/8.5 m

    Square: 450 m2

    Heating systems: Gase heating system

    Floor load: 5t/m2

    Type of foundation:  Pad foundation, Machine foundations

    Industrial floor construction: Fibre cement industrial floor

    Walls:PIR sandwich panels 120 mm, Austrija

    Roof system: PVC Protan mebrane system

    Structural construction: Steel frame construction

    Year of realization: 2018

    Industrial steel buildings covered with special insulated panels PIR 120 mm with secret fix  form Austria. This sandwich panels finishes guarantee the highest possible level of heat and acoustic insulation from the outside, making the structure not only an ideal area for the storage of goods but also a useful work area.

    Exterior

    • Exposed side 25 μm polyester coating with a PVC protective film (protects against solar radiation). The film must be removed no later than 10 weeks after the production date (visible on the longitudinal panel seam).
    • Profile 1 - 6
    • Metal gauge: 0.6 mm (smaller metal gauge on request)

    Interior

    • Exposed side 25 μm polyester coating with a PVC protective film (protects against solar radiation). The film must be removed no later than 10 weeks after the production date (visible on the longitudinal panel seam).
    • Profile 1 (profile 2 and 3 on request)
    • Metal gauge: 0.5 mm (smaller metal gauge on request)

    Insulation core

    • PIR rigid foam manufactured in continuosly foamed process, approx. 95 % closed cells, shear resistant bond with steel sheet.
    • Density approx. 40kg/m³, absolutely no chlorofluorocarbons and halogenated chlorofluorocarbons, pentane foaming system 

    Panel connection

    • Double tongue and groove system in which the special labyrinth profile allows the screw head to be counter-sunk and fully covered by the next panel - covered, hidden fastening. The intergrated seal guarantees max. possible wind tightness. The panels interlock precisely, with no thermal bridge. The facade panel PREMIUM FP-P offers excellent structural properties and enables longer spans through the use of a pressure distribution plate. 

    Independent monitoring

  • Ask project design and construction price

    Ask for price: info@iss.lv

  • Duration of project realization

    4 months

  • Feedback

    Under constructiom

  • Project realization gallery

    1angari-un-noliktavas.jpg2angari-un-noliktavas.jpg3angari-un-noliktavas.jpgangari-un-noliktavas4.jpgangari-un-noliktavas5.jpgangari-un-noliktavas6.jpgangari-un-noliktavas7.jpgangari-un-noliktavas8.jpgangari-un-noliktavas9.jpgangari-un-noliktavas10.jpgangari-un-noliktavas11.jpgangari-un-noliktavas12.jpgangari-un-noliktavas13.jpgangari-un-noliktavas14.jpgangari-un-noliktavas15.jpgangari-un-noliktavas16.jpgangari-un-noliktavas17.jpgangari-un-noliktavas18.jpgangari-un-noliktavas19.jpgangari-un-noliktavas20.jpgangari-un-noliktavas21.jpgangari-un-noliktavas22.jpgangari-un-noliktavas23.jpgangari-un-noliktavas24.jpgangari-un-noliktavas25.jpgangari-un-noliktavas26.jpgdji-0001.jpgdji-0048.jpgdji-0068.jpgimg-0791.jpgimg-1342.jpgimg-2142.jpgimg-20180827-121244.jpgimg-20180912-092146.jpgimg-20180912-092310.jpgimg-20180927-135934.jpgimg-20181102-133754.jpgimg-20181003-171933.jpgimg-20181003-171656.jpgimg-20180928-122430-1.jpgimg-20180927-135934-1.jpgimg-20180912-092310-1.jpgimg-20181003-172008.jpgangari-un-noliktavas21.jpgiss-angari-un-noliktavas.jpg

  • Finished project gallery

Gallery